环球网校是美国纳斯达克上市企业欢聚时代(NASDAQ:YY)旗下品牌 | 住房和城乡建设部 建筑人才培训合作单位
您现在的位置在: > 外贸考试 > 货运代理 > 模拟试题 >

2010国际货运代理专业英语课后习题(三)

2010-07-21 来源:互联网 作者:第一考试网

2010国际货运代理专业英语课后习题(三)

 

#

一、不定项选择

#

1."Shipment on Jan.1” is a(n) way of stipulating the date of shipment.

#

A. adaptable

#

B. inadaptable

#

C. flexible #

D. inflexible

#

答案:D

#

2.If the latest date of shipment is January 20, 2005, the goods should be shipped #

A. before January 20

#

B. between January 15 to January 25

#

C. on January 20 #

D. on or before January 20

#

答案:D. #

3. In order to prevent the from opening the L/C late, the exporter should stipulate at the same time “The relevant L/C must reach the not later than January 31, 2005.”

#

A. seller…buyer

#

B. buyer…seller #

C. buyer…importer #

D. seller…exporter #

答案:B #

4.Terms of shipment include

#

A. shipping documents

#

B. port or place of loading and unloading

#

C. partial shipment and transshipment #

D. time for shipment #

答案:ABCD #

5. In the following expressions, are not the proper ways of stipulating time of shipment.

#

A. Shipment on or about June 20, 2005

#

B. Shipment not later than July 31st , 2005

#

C. Shipment on June 20, 2005

#

D. Shipment to be made immediately. #

答案:CD

#

6.If the shipment date is “first half of August ” in the credit, then the goods must be shipped

#

A. before August 15th #

B. After August 15th #

C. August 1st to the 15th, all dates inclusive.

#

D. August 1st to the 15th, excluding August 1st.

#

答案:C #

7. Which of following expression of shipment date is clear and flexible?

#

A. Shipment on or about July 2

#

B. Shipment on June.20

#

C. Shipment as soon as possible.

#

D. Shipment to be made during the middle of September, 2003. #

答案:A.D #

8. Which of the following words applying to any date or period in the credit referring to shipment will be understood to exclude the date mentioned? . #

A. to

#

B. till #

C. after #

D. from

#

答案:C

#

二、判断题 #

1.When traders set the time for shipment in a contract, the exporter should consider whether he can get the goods ready before the shipment date and whether the ship is available if the goods are ready. ( )

#

答案:对 #

2. If the L/C stipulates that the expiry date is July 31st without a shipment date, then the latest shipment date is construed as July 21st. ( ) #

答案:错 #

3.Methods of transport is one of the terms of shipment. ( )

#

答案:对

#

4.The term “ first half” of a month refers to 1st to 16th . ( )

#

答案:错 #

5.Sometimes, the L/C only stipulates an expiry date without shipment date, which means these two dates are the same. ( ) #

答案:对

#

三、英汉互译 #

(1)英译汉 #

1)UCP500

#

2) liner freight tariff #

3) expiry date #

4) ports of call

#

5) partial shipments #

6) liner transport #

7) sailing schedule

#

8) shipping space #

9) dispatch money

#

10) bunker surcharge

#

答案:

#

1)《跟单信用证统一惯例》国际商会第500号出版物 #

2)班轮运价表 #

3)有效期

#

4)挂靠港

#

5)分批装运

#

6)班轮运输 #

7)船期表

#

8)舱位

#

9)速遣费

#

10)燃油附加费

#

(2)汉译英 #

1)租船运输 #

2)交单 #

3)违约

#

4)转船附加费 #

5)装运港 #

6)装运有效期

#

7)合同条款 #

8)最迟装运期

#

9)装运条款

#

10)信用证

#

答案: #

1) shipping by chartering

#

2) presentation of documents #

3) break contract #

4) transshipment additional #

5) port of loading

#

6) shipment date #

7) terms of contract #

8) the latest date for shipment

#

9) terms of shipment

#

10) letter of credit

#

 

#

责编: 返回顶部  打印